The content on this page was provided by an independent third party and syndicated by XPR Media. Members of the editorial and news staff of the USA TODAY Network were not involved in the creation of this content.

U.S. Data Center Construction Market to Reach USD 154.49 Billion Investment by 2031, Growing at 10.70% CAGR | Arizton

Expansion Led by Apple, Aligned Data Centers, AWS, CyrusOne, DataBank, and Digital Realty

Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.”
— Ryan Turner

CHICAGO, IL, UNITED STATES, February 25, 2026 /EINPresswire.com/ — The U.S. data center construction market is entering a high-growth phase, driven by rapid expansion in artificial intelligence, cloud computing, and data-intensive digital services. Investment valued at USD 83.97 billion in 2025 and projected to reach USD 154.49 billion by 2031, the market is being reshaped by rising demand for high-density computing, advanced storage systems, and power-intensive infrastructure. As enterprises accelerate migration toward public and hybrid cloud platforms, developers are expanding capacity to support low-latency, high-performance workloads and evolving regulatory requirements. At the same time, elevated construction costs and power constraints are intensifying competition for cost-efficient, energy-secure locations, making strategic site selection a critical factor in long-term market growth.

Report Snapshot:
MARKET SIZE BY INVESTMENT (2031): USD 154.49 Billion
MARKET SIZE BY INVESTMENT (2025): USD 83.97 Billion
CAGR BY INVESTMENT (2025-2031): 10.70%
MARKET SIZE – AREA (2031): 52.57 Million Sq. Ft.
POWER CAPACITY (2031): 13,565 MW
HISTORIC YEAR: 2022-2024
BASE YEAR: 2025
FORECAST YEAR: 2026-2031
MARKET SEGMENTATION: Facility Type, Infrastructure, Electrical Infrastructure, Mechanical Infrastructure, Cooling Systems, Cooling Technique, General Construction, Tier Standards, and Geography

AI Is Reengineering the Future of Data Center Infrastructure
AI is transforming the landscape of the global data center market, as rising adoption across industries continues to drive the expansion of hyperscale facilities and high-density infrastructure. While current AI investments have not yet fully offset overall hyperscale growth, the capacity of data centers dedicated to AI workloads is expected to nearly triple over the next five to six years. As a result, new facilities are increasingly being designed to support high-performance, AI-optimized environments that can handle complex and compute-intensive applications. This shift toward AI-focused infrastructure is directly accelerating the adoption of GPUs across data centers worldwide. To meet the growing demand for faster model training, real-time inference, and improved energy efficiency, operators are deploying GPU-powered systems capable of massively parallel computing. These technologies are enabling scalable, high-density facilities that can support next-generation AI workloads while maintaining operational efficiency.

Advanced Cooling Is Emerging as a Critical Enabler of AI-Ready Data Centers
Advanced cooling solutions are becoming essential for modern data centers as AI, ML, and IoT workloads continue to drive higher power density and heat generation. To maintain performance, reliability, and energy efficiency, operators are increasingly adopting liquid cooling, hybrid thermal systems, and sustainable cooling technologies that support high-density, AI-ready infrastructure while reducing power and water consumption. This shift is being accelerated through partnerships between data center operators, cooling technology providers, and energy innovators. A key example is the USD 1.9 billion agreement between Switch and Schneider Electric in November 2025, highlighting how advanced cooling and collaborative innovation are becoming central to building scalable, efficient, and future-ready data center facilities.

Power Systems are Becoming the New Competitive Edge in U.S. Data Centers
The rapid expansion of high-density AI and cloud workloads in the U.S. is driving a fundamental shift in data center power infrastructure. As rack densities exceed 20 kW to 30 kW, operators are increasingly adopting advanced UPS systems, lithium-ion batteries, energy storage solutions, and low-emission generator technologies to maintain reliability and energy efficiency. Modern battery and power systems are evolving into strategic assets, enabling lower operating costs, faster commissioning, and improved grid interaction. Lithium-ion batteries, with higher energy density and longer lifecycle performance, are becoming the preferred choice for AI-driven facilities.
Reflecting this transition, Google has deployed more than 100 million lithium-ion cells across its global data center portfolio, leveraging a 48V DC rack-level power architecture with integrated Battery Backup Units (BBUs) to ensure uninterrupted, high-performance operations. Together, these developments highlight how advanced power infrastructure is now central to scalability, resilience, and long-term competitiveness in the U.S. data center construction market.

Access complete data tables and in-depth insights of market

The U.S. Data Center Construction Market Research Report Includes Size, Share, and Growth in Terms of
• Facility Type: Hyperscale Data Centers, Colocation Data Centers, and Enterprise Data Centers
• Infrastructure: Electrical Infrastructure, Mechanical Infrastructure, and General Construction
• Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgears, PDUs, and Other Electrical Infrastructure
• Mechanical Infrastructure: Cooling Systems, Racks, and Other Mechanical Infrastructure
• Cooling System: CRAC & CRAH Units, Chillers Units, Cooling Towers, Condensers, and Dry Coolers, and Other Cooling Units
• Cooling Techniques: Air-based Cooling and Liquid-based Cooling
• General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Fire Detection & Suppression, Physical Security, and DCIM/BMS Solutions
• Tier Standards: Tier I & Tier II, Tier III, and Tier IV
• Regions: Southeastern U.S., Midwestern U.S., Southwestern U.S., Western U.S., and Northeastern U.S.

Key Data Center Support Infrastructure Providers
• ABB
• Caterpillar
• Cummins
• Delta Electronics
• Eaton
• Legrand
• Rolls-Royce
• Schneider Electric
• STULZ
• Vertiv
Other Data Center Support Infrastructure Providers
• Airedale
• Alfa Laval
• Asetek
• Bloom Energy
• Carrier
• Condair
• Cormant
• Cyber Power Systems
• Enlogic
• FNT Software
• Generac Power Systems
• Green Revolution Cooling (GRC)
• HIMOINSA (Yanmar)
• HITEC Power Protection
• Johnson Controls
• KOHLER (Rehlko)
• KyotoCooling
• Mitsubishi Electric
• Natron Energy
• NetZoom
• Nlyte Software
• Rittal
• Siemens
• Trane
• ZincFive
Key Data Center Construction Contractors
• AECOM
• Ames Construction
• Arup
• Barge Design Solutions
• Burns & McDonnell
• Corgan
• DPR Construction
• Fortis Construction
• Haydon
• Holder Construction
• Jacobs
• KDC
• Kiewit Corporation
• Lewis Michael Consultants
• Morgan Construction
• Morgan Corp
• Page
• Rogers-O’Brien Construction
• Rosendin Electric
• Syska Hennessy Group
• Turner Construction
Other Data Center Construction Contractors
• AlfaTech
• Aplena
• Black & Veatch
• BlueScope Construction
• Brasfield & Gorrie
• CallisonRTKL
• Clark Construction Group
• Clayco
• Climatec
• Clune Construction
• EMCOR Group
• EYP MCF
• Fitzpatrick Architects
• Fluor Corporation
• Gensler
• Gilbane Building Company
• Gray
• HDR
• Hensel Phelps
• HITT Contracting
• Hoffman Construction
• JE Dunn Construction
• JHET Architects,
• JTM Construction Group
• kW Engineering
• Linesight
• M+W Group (Exyte)
• McCarthy Building Companies
• Morrison Hershfield
• Mortenson
• Pepper Construction
• Rosendin
• Ryan Companies
• Salute Mission Critical
• Sheehan Nagle Hartray Architects
• Skanska
• Southland Industries
• STO Building Group
• Sturgeon Electric Company
• Suffolk Construction
• Sundt Construction
• The Mulhern Group
• The Walsh Group
• The Weitz Company
• The Whiting-Turner Contracting Co.
• TRINITY Group Construction
• Walbridge
• WSP
Key Data Center Investors
• Apple
• Applied Digital
• AWS
• CyrusOne
• DataBank
• Digital Realty
• Equinix
• Google
• Meta
• Microsoft
• NTT DATA
• Vantage Data Centers
Other Data Center Investors
• AAIM Data Centers
• Aligned Data Centers
• American Tower
• Aubix
• Centersquare
• CloudHQ
• Cologix
• Compass Datacenters
• COPT Data Center Solutions
• Core Scientific
• Centra
• Crusoe
• DartPoints
• DC BLOX
• DigiPowerX (DigiHost)
• EdgeConneX
• EdgeCore Digital Infrastructure
• Element Critical
• FifteenFortySeven Critical Systems Realty (1547)
• Flexential
• H5 Data Centers
• HostDime
• Hut 8
• Iron Mountain
• Netrality Data Centers
• Novva Data Centers
• PhoenixNAP
• PowerHouse Data Centers
• Prime Data Centers
• QTS Realty Trust
• Sabey Data Centers
• Skybox Datacenters
• STACK Infrastructure
• Stream Data Centers
• Switch
• T5 Data Centers
• TierPoint
• WhiteFiber
• Yondr
• 365 Data Centers
• 5C Data Centers
• New Entrants
• Ada Infrastructure
• Ardent Data Centers
• Beale infrastructure
• Big Sky Digital Infrastructure
• CleanArc Data Centers
• CloudBurst Data Centers,
• Colovore
• Crane Data Centers
• Edged Energy
• Fleet Data centers
• Lambda
• LightHouse Data Centers
• Metroblocks
• NE Edge
• Penzance
• Prometheus Hyperscale
• Quantum Loophole
• RadiusDC
• Related digital
• Rowan Digital Infrastructure
• Sailfish Investors
• Tract

Discover Connected Market Opportunities:
U.S. Data Center Colocation Market – Industry Outlook & Forecast 2025-2030
https://www.arizton.com/market-reports/us-data-center-colocation-market
Global Data Center Construction Market Landscape 2025-2030
https://www.arizton.com/market-reports/data-center-construction-market-investment-forecast

What Key Findings Will Our Research Analysis Reveal?
• How big is the U.S. data center construction market?
• What is the estimated market size in terms of area in the U.S. data center construction market by 2031?
• What is the growth rate of the U.S. data center construction market?
• What are the key trends in the U.S. data center construction market?
• How many MW of power capacity is expected to reach the U.S. data center construction market by 2031?

Why Arizton?
100% Customer Satisfaction
24×7 availability – we are always there when you need us
200+ Fortune 500 Companies trust Arizton’s report
80% of our reports are exclusive and first in the industry
100% more data and analysis
1500+ reports published till date

Post-Purchase Benefit
• 1hr of free analyst discussion
• 10% off on customization

About Us:
Founded in 2017, Arizton Advisory & Intelligence delivers data-driven market research and strategic consulting that empowers clients to make informed decisions and drive growth. Combining quantitative and qualitative insights, we provide in-depth analysis across industries including Agriculture, Consumer Goods, Technology, Automotive, Healthcare, Data Centers, and Logistics. Recognized by top-tier media, our expert team transforms complex market data into actionable strategies, helping clients anticipate trends, seize opportunities, and stay ahead of the competition.

Jessica
Arizton Advisory & Intelligence
+1 312-680-2940
jessica@arizton.com
Visit us on social media:
LinkedIn
Facebook
X

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

Golden Sun Movers opened a new business location in Palm Springs

Golden Sun Movers opened a new business location in Palm Springs

PALM SPRINGS, CA, UNITED STATES, February 26, 2026 /EINPresswire.com/ — Golden Sun Movers, a moving company

February 26, 2026

Immunological profile identified that predicts risk of infection in multiple myeloma

Immunological profile identified that predicts risk of infection in multiple myeloma

The results of this study by Cima Universidad de Navarra will enable more personalised medicine that identifies the

February 26, 2026

.cv Registry Releases H2 2025 Premium Domains Report, Revealing Strong Global Demand for Professional Identity Domains

.cv Registry Releases H2 2025 Premium Domains Report, Revealing Strong Global Demand for Professional Identity Domains

297 Premium Domains Registered, $126,307 in Wholesale Revenue, and a Growing Ecosystem of Career First Digital

February 26, 2026

Eagle Plains Increases Saskatchewan Gold Royalty Portfolio

Eagle Plains Increases Saskatchewan Gold Royalty Portfolio

CRANBROOK, BRITISH COLUMBIA / ACCESS Newswire / February 26, 2026 / Eagle Plains Resources Ltd.

February 26, 2026

Wireless Broadband Alliance Validate Wi-Fi 7 MLO as the New Benchmark for Residential Reliability in Latest Field Trials

Wireless Broadband Alliance Validate Wi-Fi 7 MLO as the New Benchmark for Residential Reliability in Latest Field Trials

Phase 2 residential trials led by CableLabs and Intel demonstrate Multi-Link Operation (MLO) delivers wired-like

February 26, 2026

HBCU GO 2026 Basketball Season Week 9-Sat. Feb 28: Standings Tighten as Bethune-Cookman and Southern Battle for Position

HBCU GO 2026 Basketball Season Week 9-Sat. Feb 28: Standings Tighten as Bethune-Cookman and Southern Battle for Position

HBCU GO Closes Out Powerful Black History Month Slate While Delivering the No. 1 vs. No. 2 SWAC Showdown with Major

February 26, 2026

Leading Safety Helmets Tester Company to Showcase Advanced Protection Technologies at A+A Trade Fair

Leading Safety Helmets Tester Company to Showcase Advanced Protection Technologies at A+A Trade Fair

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — The A+A International Trade Fair in Düsseldorf stands

February 26, 2026

How to Find a Professional Safety Glove Testing Machine Manufacturer with CE Certification

How to Find a Professional Safety Glove Testing Machine Manufacturer with CE Certification

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — The global market for personal protective equipment

February 26, 2026

Choosing the Ideal Aviation Development Company with Intelligent Solutions

Choosing the Ideal Aviation Development Company with Intelligent Solutions

Strategic aviation app development with intelligent, scalable, and future-ready digital transformation solutions. Our

February 26, 2026

Infosearch BPO gearing up for big annotation projects in 2026

Infosearch BPO gearing up for big annotation projects in 2026

CHENNAI, INDIA, February 26, 2026 /EINPresswire.com/ — Infosearch BPO, one of the most successful business process

February 26, 2026

Revive Design and Renovation Named 16th Fastest-Growing Company in Tampa for 2025 after Record-Breaking 2024 Performance

Revive Design and Renovation Named 16th Fastest-Growing Company in Tampa for 2025 after Record-Breaking 2024 Performance

The full-service interior design and home remodeling firm based in Tampa has been recognized as the 16th

February 26, 2026

National CACFP Association Announces Speakers for 40th Annual National Child Nutrition Conference

National CACFP Association Announces Speakers for 40th Annual National Child Nutrition Conference

ROUND ROCK, TX, UNITED STATES, February 26, 2026 /EINPresswire.com/ — The National CACFP Association proudly announces

February 26, 2026

The Wedding Privé Official Launch in Rome as the World’s First Global Association for Multi-Destination Luxury Weddings

The Wedding Privé Official Launch in Rome as the World’s First Global Association for Multi-Destination Luxury Weddings

A private global association reshaping how multi-destination luxury weddings are planned, aligned, and experienced

February 26, 2026

GESTER: China Top PPE Testing Equipment Company Leading Global Safety Standards

GESTER: China Top PPE Testing Equipment Company Leading Global Safety Standards

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — In the rapidly evolving landscape of workplace safety

February 26, 2026

BlurMe Surpasses 600 U.S. School Districts Using Its AI Video Redaction Platform Amid Stricter FERPA Enforcement

BlurMe Surpasses 600 U.S. School Districts Using Its AI Video Redaction Platform Amid Stricter FERPA Enforcement

Over 600 U.S. school districts now use BlurMe’s AI technology to automate video redaction and maintain FERPA compliance

February 26, 2026

Proxymity and Euroclear Announce Strategic Investment, with Euroclear Becoming Newest Member of its Consortium

Proxymity and Euroclear Announce Strategic Investment, with Euroclear Becoming Newest Member of its Consortium

BRUSSELS, BE AND LONDON, UK / ACCESS Newswire / February 26, 2026 / Proxymity, the digital investor communications

February 26, 2026

Senegal’s Petrosen Heads to Caribbean Energy Week to Collaborate with Suriname

Senegal’s Petrosen Heads to Caribbean Energy Week to Collaborate with Suriname

Petrosen’s delegation is expected to engage with Suriname’s Staatsolie to share insights on offshore development,

February 26, 2026

A Complete Guide to Martindale Testing by the Best Martindale Abrasion Tester Supplier

A Complete Guide to Martindale Testing by the Best Martindale Abrasion Tester Supplier

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — Durability represents the cornerstone of consumer

February 26, 2026

eMudhra Introduces Trust Infrastructure for AI Economy

eMudhra Introduces Trust Infrastructure for AI Economy

eMudhra Limited (NSE:EMUDHRA)BENGALURU, KARNATAKA, INDIA, February 26, 2026 /EINPresswire.com/ — eMudhra today

February 26, 2026

Best AG Equipment Financing Companies in Texas Ranking Released for 2026

Best AG Equipment Financing Companies in Texas Ranking Released for 2026

Learn about the best AG Equipment Financing companies in Texas through IRAEmpire' new list for 2026. HOUSTON, TX,

February 26, 2026

Latino-founded Applevel reports $40M valuation, integrating WhatsApp into GoHighLevel CRM and OpenAI

Latino-founded Applevel reports $40M valuation, integrating WhatsApp into GoHighLevel CRM and OpenAI

The platform syncs WhatsApp conversations inside GoHighLevel, enables AI-assisted responses via OpenAI, and reports

February 26, 2026

Empathy in Medicine Initiative Launches Student Chapter Program to Advance Human-Centered Communication in Healthcare

Empathy in Medicine Initiative Launches Student Chapter Program to Advance Human-Centered Communication in Healthcare

GREAT NECK, NY, UNITED STATES, February 26, 2026 /EINPresswire.com/ — The Empathy in Medicine Initiative (EMI), a

February 26, 2026

Global Outreach Organization, “Beyonders” Launched by Penta Security

Global Outreach Organization, “Beyonders” Launched by Penta Security

SEOUL, SOUTH KOREA, February 26, 2026 /EINPresswire.com/ — Penta Security, a leading cybersecurity company, has

February 26, 2026

Saviah Technologies and SynaXG Unveil End to End Private 5G Solution for Enterprise and Industrial Networks at MWC 2026

Saviah Technologies and SynaXG Unveil End to End Private 5G Solution for Enterprise and Industrial Networks at MWC 2026

Integrated Saviah 5G Core + SynaXG Cloud-Native RAN and Edge Platform Delivers 24/7 Reliability and Deterministic

February 26, 2026

JPLoft Leads FinTech App Development with AI-Powered, Compliance-Ready Solutions

JPLoft Leads FinTech App Development with AI-Powered, Compliance-Ready Solutions

AI-powered, compliance-ready fintech app development by JPLoft, delivering secure, scalable, and regulation-aligned

February 26, 2026

Moose Frame Media Launches Photographic Initiative to Document Distinctive Environments and Architecture

Moose Frame Media Launches Photographic Initiative to Document Distinctive Environments and Architecture

Founded by photographer Justin Moose, MooseFrameMedia delivers cinematic, story-driven photography for families,

February 26, 2026

Industry Insights: The Role of Material Science in Defining a High Quality Durable Waterproof Ski Jacket Supplier

Industry Insights: The Role of Material Science in Defining a High Quality Durable Waterproof Ski Jacket Supplier

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — The global alpine sports market is currently defined

February 26, 2026

Carter Ward’s Award-Winning Romantic Film STEP BACK, DOORS CLOSING Debuts on VOD March 17 from Freestyle Digital Media

Carter Ward’s Award-Winning Romantic Film STEP BACK, DOORS CLOSING Debuts on VOD March 17 from Freestyle Digital Media

Following its theatrical run beginning Valentine’s Day Carter Ward’s debut STEP BACK, DOORS CLOSING debuts on all VOD

February 26, 2026

IBA President Umar Kremlev promises prize money for boxers at LA 2028

IBA President Umar Kremlev promises prize money for boxers at LA 2028

The announcement was made in the scenario if the IOC doesn’t change their policy towards athletes’ rewards. LAUSANNE,

February 26, 2026

Looking for a Laboratory Protective Clothing Tester Supplier? Key Criteria to Consider

Looking for a Laboratory Protective Clothing Tester Supplier? Key Criteria to Consider

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — The global demand for high-performance Personal

February 26, 2026

Guajardo Injury Law Sponsors Northwest Little League, Strengthening Community Ties In Northwest & North Central Austin

Guajardo Injury Law Sponsors Northwest Little League, Strengthening Community Ties In Northwest & North Central Austin

Guajardo Injury Law supports youth development through its Northwest Little League partnership, promoting accessible

February 26, 2026

KLEF (Deemed to be University) Earns DASCA Accreditation

KLEF (Deemed to be University) Earns DASCA Accreditation

INDIA, February 26, 2026 /EINPresswire.com/ — Koneru Lakshmaiah Education Foundation (KLEF Deemed to be University), a

February 26, 2026

Groundbreaking Ceremony Signals Beepo Relocation and MicroSourcing Expansion in Clark

Groundbreaking Ceremony Signals Beepo Relocation and MicroSourcing Expansion in Clark

MicroSourcing grows its Clark presence as Beepo transitions to a new, upgraded delivery facility. As we continue to

February 26, 2026

Leather Industry Innovations: GESTER at ACLE as a Footwear Testing Equipment Factory

Leather Industry Innovations: GESTER at ACLE as a Footwear Testing Equipment Factory

QUANZHOU, FUJIAN, CHINA, February 26, 2026 /EINPresswire.com/ — The global leather and footwear sectors are currently

February 26, 2026

Ivy Tier Introduces New Approach to Competitive US College Admissions

Ivy Tier Introduces New Approach to Competitive US College Admissions

The new framework emphasizes externally validated projects over traditional résumé stacking. LOS ANGELES, CA, UNITED

February 26, 2026

IntraTEM Earns Great Place To Work® Certification™ with 91% Employee Approval

IntraTEM Earns Great Place To Work® Certification™ with 91% Employee Approval

Great Place to Work® certifies IntraTEM following independent, anonymous employee feedback on workplace culture. LOS

February 26, 2026

Affordable Housing Investors Council Selects Momentum Association Management as New Association Management Partner

Affordable Housing Investors Council Selects Momentum Association Management as New Association Management Partner

The Affordable Housing Investors Council (AHIC) has selected Momentum Association Management as its new association

February 26, 2026

MWE Invites Global Partners and Clients to Experience Advanced Digital Signage Solutions at ISLE 2026

MWE Invites Global Partners and Clients to Experience Advanced Digital Signage Solutions at ISLE 2026

MWE invites global partners to ISLE 2026 (Booth 6-F20, Mar 5-7) to experience cutting-edge outdoor digital signage and

February 26, 2026

ChackTok Unveils Metrology-Grade Full Body 3D Scanner, Revolutionizing 3D Printing for Event and Retail Businesses

ChackTok Unveils Metrology-Grade Full Body 3D Scanner, Revolutionizing 3D Printing for Event and Retail Businesses

With 0.01 mm accuracy and 20-second scanning, ChackTok helps photo booth and event businesses turn experiences into

February 26, 2026

TRIMED’s Women-Led Team Converts Ancient Sanskrit Medical Texts into AI-Searchable Data for In-Silico Discovery

TRIMED’s Women-Led Team Converts Ancient Sanskrit Medical Texts into AI-Searchable Data for In-Silico Discovery

BANGALORE, INDIA, February 26, 2026 /EINPresswire.com/ — ATRIMED, a research-driven life sciences company specializing

February 26, 2026